Environmental Documents for NDOR Projects
Return to Main Environmental Page
Environmental Status of LPA Projects (This is always the most current document)
Link to Local Projects Environmental Area
NDOR & FHWA Programmatic Agreement for NEPA Categorically Excluded Transportation Projects
NOTE: Some of these files are VERY large PDF's. Allow adequate time to view/download
Fort Street - Missouri River, Bridges; Fort Street - Missouri River, Resurfacing Project # IM-680-9(30) & IM-BH-680-9(29) Control # 22264 & 22264A
Project # STPD-IM-STPN-TMT-10-2-(114) Control # 42103A (A, B, C)
LB 84 designations:
A=Phase 1 (not on LB 84) B=Phase 2 LB 84 C=Phase 3 LB 84
404 Permit Application
Finding of No Significant Impact (FONSI) 3M
Environmental Assessment 33M
Technical Appendix for Environmental Assessment 107M
Elimination of Design Elements (Stone School)
Moorefield East and West Project # STP-23-2(121) Control # 70889
and
Curtis East Project # STP-23-2(124) Control # 71102
Stanton South Project # STP-57-3(107) Control # 31889
US Highway 75 Plattsmouth to Bellevue 2007-00796-WEH
2003-10140-WEH (U.S. 34 Bellevue Bridge)
Oreapolis Site Development Wetland Mitigation Plan - Aug 2011 - 12.8M
USACE Public Notice (2007-00796-WEH)
ATTACHMENTS
Section 404 - Permit Application - 11.5M
Attachments A
Bridge Plan - 353K
Roadway Plans - 11.2M
Attachments C
Avoidance Memo - 6th Street Connector - 908K
Avoidance Memo - Fairview Road Interchange - 945K
Avoidance Memo - Platteview Interchange - 2.2M
Avoidance Memo - Webster Boulevard - Haswell Drive - 571K
Attachment D
Oreapolis Mitigation Site Plan - 12M
Environmental Assessment (Draft) 15M