State Brand-no action

NDOR logo-no action

Materials & Research Division - Local Projects Section
2012 Archives
for Current Updates & Information Page

Archives - 2012 Updates

Date Updated/Added Details
12-6-12 PDF The Environmental Status of LPA Projects List has been updated
11-19-12 PDF

The list of Approved Consultants for NDOR/LPA Wetland Delineation Services has been updated.

11-15-12 PDF

The preliminary qualifying list of bridges on the Federal-aid system and instructions are now available online.  This is a preliminary list and bridges appearing on the list are not guaranteed to be selected to receive funding. 

11-15-12 Link The November 2012 Newsletter has been posted
11-5-12 PDF The Environmental Status of LPA Projects has been updated
10-10-12 DR 39a
DR 39b
Forms and Instructions are now available for Notification of Completion for Consultant Professional Services (DR 39a) and Notification of Completion for LPA Professional Services (DR 39b). The instructions are the first page of each form.
10-4-12 Link The LPD Project Coordinator Guidelines Manual is now available online.
10-2-12 PDF Updated: List of Approved Wetland Delineation Consultants. NOTE: Please review the document for submittal requirements and contact information
9-21-12 Excel Project Quantity Estimates - Spreadsheet is now available - large file 16M
9-10-12 DR 39a    DR 39b

Forms are now available for Notification of Completion for Consultant Professional Services (39a) and Notification of Completion for LPA Professional Services (39b).

9-5-12 PDF The Environmental Status of LP Projects list has been updated and is now available
8-29-12 PDF The approved NDOR Local Bridge Selection Policy is now available.
8-29-12 Link to Area FHWA’s responses to NDOR and Soft Match County Bridge Balance Review for 5-13-12 and 8.17.12 are now available
8-21-12 Links to
each set are
to the right
4 forms were modified to include a place for RC's to add the date the form was completed.

Short List Ranking Form: PDF - Word
Short List Ranking Summary Form: PDF - Word
Final Selection Ranking Form: PDF - Word
Final Selection Ranking Summary Form: PDF - Word
 

8-21-12 PDF Added: Public Comments on Draft #2 of the Bridge Selection Policy
8-16-12 PDF Revised: The LPA Consultant Selection Procedure for On-Call Construction Engineering Services. Details were added with regard to contacting the selected consultant.
8-16-12 PDF Revised: The LPA Consultant Selection Procedure for On-Call Environmental Services. Details were added with regard to contacting the selected consultant.
8-16-12 Link to RFP Web Area
The forms are also found in the appropriate LP Construction and Consultant areas
The Cost Breakdown Form (DR 162) has been REVISED into three forms to accompany all invoices. The revised forms are separated by Agreement Type.  162, 162A and 162B
8-2-12 PDF Added: A report on the Environmental Status of LPA Projects. This will always be the most current info.
7-18-12 Link Updated: List of Certified Consultants. All inquiries or changes to the Consultant information should be sent to DOR.PDAnnualCertification@nebraska.gov
7-18-12 Link Updated: List of Certified Consultants for Construction Inspection. All inquiries or changes to the Consultant information should be sent to DOR.PDAnnualCertification@nebraska.gov
7-9-12 Link to
Anonymous
Survey
The annual Workplace Development Survey is available. The Survey is Anonymous.
8-7-12- The Survey is CLOSED
7-2-12 Link to PDF The Nebraska Department of Roads (NDOR) has posted its updated list of Certified Consultants including contact information for each firm. All firms listed are certified by the NDOR thru June 30, 2013.  Please submit any corrections to this list to the email address: DOR.PDAnnualCertification@nebraska.gov
7-2-12 PDF   Word A Status of Utilities Template is now available on the Master List page
6-21-12 PDF The LPA Guidelines Manual, Chapter 1- Introduction, has been revised and updated.
6-21-12 PDF ADDED: Biological Evaluation Process (Matrix) for the Federal Aid Transportation Program in Nebraska - 24M file
6-19-12 Link Revised: Checklists 06-15, 06-50, 06-60
6-19-12 PDF ADDED: NDOR procedure for the design and detailing of reinforced concrete box culverts
6-19-12 Word ADDED: Checklist 06-65 is the 100% Bridge Plan Review checklist
6-5-12 Link to 3 Items Links to Draft #2 of Local Bridge Selection Policy, Background & Summary document, and Public Comments on Draft #1
5-25-12 PDF    Word ADDED: Required certification for Environmental to be completed and submitted with PS & E package submittal.
5-25-12 PDF    Word ADDED: Required certification for Railroad Impact to be completed and submitted with PS & E package submittal.
5-25-12 PDF    Word ADDED: Required certification for Design to be completed and submitted with PS & E package submittal.
5-22-12 PDF The List of Certified Consultants for Standard Work Category 101A (NEPA Studies) has been updated.
5-18-12

PDF    Word

Combine Resolution Templates have been updated to include the new Consultant Management Resolution Template (below)
5-18-12 PDF    Word Added - Consultant Management Resolution Template (also included in the item above)
5-14-12 PDF   Word DR 299 has been revised throughout
5-14-12 PDF   Word Pre-Negotiation Memo Template - Multiple changes to the document including header information, additional line items added to the table, and formatting of the document
5-9-12 PDF FHWA’s response to NDOR and Soft Match County Bridge Balance Review, dated 5-7-12, is available
5-8-12 PDF A Provisional RC Policy is now available.  The objective of the policy is to provide a process for NDOR to approve provisional RCs for the purpose of moving projects forward so funding can be obligated.
5-4-12 PDF   Word CE Scope of Services - modification of language to the construction inspection task
5-1-12 PDF   Word New Form! Status of Utilities Report
5-1-12

PDF   Word

DR 530 - Funding columns updated
5-1-12 PDF   Word DR 530a - Funding columns updated
5-1-12 PDF   Word Pre-Negotiation Memo Template - Purpose of Negotiation statement added
4-3-12

PDF

FHWA's response to NDOR, and Soft Match County Balance Review
4-3-12 PDF NDOR's Soft Match Credit Release Request to FHWA
3-29-12

PDF   Word

Added to the Project Initiation Page - DR 530a - A Project Programming Request form for NON-Infrastructure projects
3-28-12 PDF   Word Revisions to the Request for Proposal (RFP) Templates have been made. Changes were primarily in the Schedule and Exhibit A sections.
3-20-12 Link The March 2012 NDOR Civil Rights newsletter is now available. This issue is a special edition with FAQs about Civil Rights compliance for local public agencies.
3-14-12 Document FHWA’s response to NDOR’s Soft Match “Source” Project Review Proposal
3-13-12

PDF

Updated - LPA Consultant Selection Procedure for On-Call Construction Engineering (CE) Services
3-5-12

Document

NDOR's Soft Match "Source" Project Review Proposal to FHWA
3-5-12

5 SETS of CE Docs
docs are below

FIVE Detailed Work Plan Matrices for (CE) Construction Engineering Services 
the docs are the 5 listed below by date of 3-5-12
3-5-12

PDF     Excel

RC Cost Estimates & Fringe Benefits Calculator (CE)
3-5-12

PDF     Word

Scope of Services (CE)
3-5-12 PDF     Excel Work Plan for Sub-Consultant Survey/Staking Services (CE)
3-5-12 PDF     Excel Work Plan for Consultants (CE)
3-5-12 PDF     Excel Work Plan for LPA's (CE)
3-2-12

Document

Deadlines for FY 2013 Projects
3-2-12

Newsletter

The March 2012 Local Ledger Newsletter
2-28-12

Dr250 Word
Dr250 pdf

Consultant Work Order Form for Local Fed-Aid Projects has been updated. Changes to the Notice-to-Proceed language and also the Distribution List were incorporated into the form.
2-17-12

News Release

Safe Routes Nebraska Promotes Safe Walking & Biking Day
2-16-12

News Release

List of Transportation Enhancement Projects Awarded
2-6-12

Document

FHWA Concurrence with NDOR's FIRE FY10 Soft Match Process Review Response
1-24-12

Master List

ADDED: Master List Page of all LPD Docs, Forms, Templates & Samples - Alpha Format
1-13-12

12-72

Question #1 - Are the work zone traffic plans signed and sealed by a professional engineer?

1-11-12

DR299

Allows 45 days from 299 date for submittal of final reimbursement requests