|
|
Planning
& Project Development
Questions/Comments
Text
Only
Mission
Statement
We provide resources
(environmental products and services; project definition; utilities, consultants,
and agreement services) that other Divisions/Districts need to develop
a safe and efficient highway system that is environmentally compatible
and cost effective.
Division
Duties and Responsibilities
The Planning &
Project Development Division is responsible for:
-
Providing engineering
reviews and corridor studies on selected highway projects.
-
Coordination
with local, state, and federal agencies to assist in the evaluation
of engineering alternatives and environmental impacts associated with
highway projects.
-
Obtaining environmental
approvals, 404 permits, and floodplain permits.
-
Providing liaison
with utilities, consultants, and political subdivisions.
-
Preparing, negotiating,
and administering engineering and other agreements with utilities,
consultants, and political subdivisions.

PLANNING & MEASURING UNIT
Long Range Transportation Plan
-
Research planning
related information.
-
Coordinates
the measurement of the Department's performance indicators.
-
Publishes and
updates the Department's performance measurement report.
-
Measures the
level of the Department employees' satisfaction.
-
Measures the
level of internal customer satisfaction between divisions and districts.
-
Coordinates
the measurement of external customer satisfaction.
- Coordinates and administers
informational surveys.

View
Current RFP's
The Agreements and Consultant
Services Section reports directly to the Project Development Engineer
and is responsible for:
-
Preparing, coordinating,
reviewing, distributing and maintaining (through the Agreement Monitoring
System) agreements, other than those associated with right-of-way
acquisition, purchasing, or the contracts and bonds for highway construction.
-
Providing liaison
with consulting engineering firms, participating in the selection
of and negotiation with consultants, and maintaining certification
records of consultants.
-
Reviewing consultant
billings and submitting them for payment and audit.
- Submitting audits to consultants and recommending
settlement, if necessary.
Noise
Policy
The Noise & Air Section is responsible
for:
-
Performing noise and air quality studies
to determine the environmental impact of projects.
-
Preparing final noise reports.
-
Designing noise abatement solutions.
- Conducting public hearings to address noise and
air impacts.
| Contact
Name |
|
| Mike Owen, Division
Engineer |
402-479-4795 |
| Cindy
Veys, Environmental
Section Manager |
402-479-4410 |
| Len
Sand, Highway Environmental
Program Manager |
402-479-4411 |
Randy ElDorado, Planning
& Location Studies Engineer
|
402-479-4417 |
| Brandie Neemann, Corridor
Studies Engineer |
402-479-4421 |
| David
Schoenmaker, Location Studies/Traffic Analysis
& Traffic Data Collection Engineer |
402-479-3924 |
| Jeff
Cumblidge, Data Collection Supervisor |
402-479-4509 |
| Ron
Schlautman, MPO &
Urban Liaison Engineer; State Bicycle & Pedestrian Coordinator |
402-479-4338 |
| Mark
Ottemann, Utilities/Noise
& Air Studies Engineer |
402-479-4684 |
| Dawn
Knott, Agreements
Engineer |
402-479-4778 |
| Jason
Jurgens, Highway
Environmental Programs Manager (Environmental Permits Unit)
|
402-479-4418 |
| Ronald
Poe, Highway Environmental Programs
Manager (Roadside Stabilization) |
402-479-4499 |
| Gabe
Robertson, Highway Environmental Programs Specialist (Roadside
Stabilization) |
402-479-4685 |
| Art
Thompson, Landscape Architect |
402-479-4839 |
(Systematic Alien Verification for Entitlements)
Document |
PDF |
Word
|
| Explanation of LB403 |
|
----- |
| Procedure for Authorizing NDOR Benefits to Individual or a Sole Proprietorship |
|
----- |
| NDOR Attestation Form - DR289 |
|
|
| Sample Language for New Employee Work Eligibility Status |
|
|
|