Hwys 34 & 75
Murray to Plattsmouth


Build Nebraska Act
Tier 3 Project

Text Only Subscribe to Email Updates Main Build Nebraska Act Page Questions NDOR Main Page

IMPORTANT! If you're trying to view these PDF's in Explorer, the Controls to Zoom In
ONLY show up if you hold your cursor over the bottom of the browser window
 after the file is opened in that window

Information Current as of November 2010

Views of Proposed Construction

Proposed Construction Map - PDF

Aerial Photo of Proposed Construction
- PDF

Background Info: A public hearing was held on this project January 19, 2005

Proposed Construction : The proposed improvements begin 0.3 miles south of the Nebraska Highway 1 / Murray Road junction and extend north on US 34 / US 75 to a point approximately 0.1 miles south of the Oak Hill Road/Avenue B intersection in Plattsmouth. The total length of this project is 7.0 miles. This proposed project takes a two-lane rural highway and converts it to a four-lane expressway with a raised curbed median.

Lighting/Signals/Signing: Lighting warrants are being reviewed. At a minimum, new lights will be located at intersections that are currently lighted. Existing traffic signals will be modified to accommodate the new 4-lane roadway at the US 34 / US 75 / N 66 junction. No new traffic signals are included with the project at this time; however, three additional intersections will be designed to accommodate traffic signals in the future including the N 1 / Murray Rd., Waverly Rd. / Rock Bluff Rd., and Mynard Rd. /Horning Rd. intersections.

Related Studies: US-75 Corridor Study from Nebraska City to Bellevue, September 1998

Right-of-Way: Right-of-way, temporary construction easements, and changes in the controlled access will need to be purchased at various locations along this project. No homes or buildings will need to be acquired as a result of this project.

Phasing: This project will not require any detours. Traffic will be carried through construction on the existing roadway while the new northbound lanes are constructed. Then two-way traffic will be shifted over to the new lanes while the existing lanes are rehabilitated or reconstructed.

Schedule: This project is not currently in the five-year program. Once construction begins, it will require two construction seasons to complete.

Estimated Cost: The estimated cost, including right-of-way, is 21.5 million dollars (present day dollars).