Official State of Nebraska Web Site

 




Regular Acrobat Reader Download
Help with PDF's for those with visual disabilities


 

Wood River West
STPD-STPN-TMT-11-2(114)   Control # 42032

Text Only

Find out more about automatic updates before you subscribe Click to subscribe to automatic updates from NDOR whenever this page changes

If you have questions about this project,
 you may call the NDOR District 4 Office at 308-385-6265,
 or use the “Ask a Question” link on the main page of the NDOR website


 

Location Map 1.1M

Aerial Mosaic of Proposed Construction 1M

Info updated 5-2011

Proposed Construction: This project is along highway N-11, beginning one mile south of the east junction of N-11 and US-30 and ending one half mile north of the west junction of N-11 and US-30. Highway N-11 will be built on a new alignment crossing the south and west edges of Wood River. A viaduct will be built over the Union Pacific railroad tracks and US-30 near the west junction of N-11 and US-30. A pedestrian bridge will be constructed over the UPRR and Highway 30, near East Street.

Related Studies: A location study was completed and approved in February of 2005.

Right-of-Way: Acquisition of additional highway ROW and construction easements will be required throughout the length of the project. One home and several out buildings will be acquired and relocation assistance will be provided.

Phasing: Most of this project is on new alignment and will not impact traffic. Where it will be in conflict, the project will be built under traffic utilizing staged construction and temporary surfacing.

Schedule: This project us underway, and should be completed in the fall of 2012.