March - April 2004
Click on an image to open a larger view in a separate browser window
Return to Photo Archive Page

April 2004 paving the North Frontage Road east of 127th Street

April 2004 paving the North Frontage Road east of 127th Street and finishing a block out for a Driveway

April 2004 Paving Machine and the Concrete Placement Machine paving the North Frontage Road east of 127th Street

April 2004 Concrete Finishers behind the Paving Machine on the North Frontage Road east of 127th Street

April 2004 curing concrete pavement for westbound West Dodge Road west of 120th Street

April 2004 paving sidewalk south of the South Frontage Road west of 120th Street in front of Burke High School

April 2004 making Concrete Test Cylinders to determine the strength of the concrete

April 2004 Media Day held at the West Dodge Field Office located at 11204 Davenport Street

April 2004 preparing to pave two westbound lanes of West Dodge road west of 120th Street

April 2004 paving two westbound lane of West Dodge Road west of 120th Street

April 2004 Dowel Bar placement in front of the paving Machine for westbound West Dodge Road west of 120th Street

April 2004 tining and curing machine, paving machine and the concrete placement machine (Paving Train) for westbound West Dodge Road west of 120th Street

April 2004 wetting the foundation coarse just prior to paving the westbound lane of the South Frontage Road west of 120th Street

April 2004 concrete placement ahead of the paving machine for the westbound lane of the South Frontage Road west of 120th Street

April 2004 paving the westbound lane of the South Frontage Road west of 120th Street

April 2004 finishing the concrete pavement for the westbound lane of the South Frontage Road west of 120th Street

March 2004 preparing to install footings for retaining wall west of Burke Boulevard along Whitehall Condominiums

March 2004 Installing Web Cam at approximately 125th Street along the South Frontage Road

March 2004 preparing to close the North Frontage Road west of Menards

March 2004 installing Drain Tile along the retaining wall for the South Frontage Road west of 120th Street