March
- April 2004 |
|||
|
April 2004 paving the North Frontage Road east of 127th Street |
April 2004 paving the North Frontage Road east of 127th Street and finishing a block out for a Driveway |
April 2004 Paving Machine and the Concrete Placement Machine paving the North Frontage Road east of 127th Street |
April 2004 Concrete Finishers behind the Paving Machine on the North Frontage Road east of 127th Street |
|
April 2004 curing concrete pavement for westbound West Dodge Road west of 120th Street |
April 2004 paving sidewalk south of the South Frontage Road west of 120th Street in front of Burke High School |
April 2004 making Concrete Test Cylinders to determine the strength of the concrete |
April 2004 Media Day held at the West Dodge Field Office located at 11204 Davenport Street |
|
April 2004 preparing to pave two westbound lanes of West Dodge road west of 120th Street |
April 2004 paving two westbound lane of West Dodge Road west of 120th Street |
April 2004 Dowel Bar placement in front of the paving Machine for westbound West Dodge Road west of 120th Street |
April 2004 tining and curing machine, paving machine and the concrete placement machine (Paving Train) for westbound West Dodge Road west of 120th Street |
|
April 2004 wetting the foundation coarse just prior to paving the westbound lane of the South Frontage Road west of 120th Street |
April 2004 concrete placement ahead of the paving machine for the westbound lane of the South Frontage Road west of 120th Street |
April 2004 paving the westbound lane of the South Frontage Road west of 120th Street |
April 2004 finishing the concrete pavement for the westbound lane of the South Frontage Road west of 120th Street |
|
March 2004 preparing to install footings for retaining wall west of Burke Boulevard along Whitehall Condominiums |
March 2004 Installing Web Cam at approximately 125th Street along the South Frontage Road |
March 2004 preparing to close the North Frontage Road west of Menards |
March 2004 installing Drain Tile along the retaining wall for the South Frontage Road west of 120th Street |
|
Rich Zelensky Highway
Project Manager |
|||