Removing unsuitable material along the North Frontage Road between 132nd St. & 120th St.. |
Removing unsuitable material and backfilling with granular material along the North Frontage Road between 132nd St. & 120th St.. |
Pumping concrete for the North Frontage Road retaining wall between 132nd St. & 120th St.. |
Pumping and vibrating concrete for the North Frontage Road retaining wall between 132nd St. & 120th St.. |
|
Looking at the South Frontage Road Westbound from 120th Street |
West Dodge Road looking Westbound from 120th Street notice the North & South Frontage Roads. |
Pumping Concrete for the North Frontage Road retaining wall west of 120th Street. |
Pumping and vibrating concrete for the North Frontage Road retaining wall west of 120th Street. |
|
Grouting tie holes along the South Frontage Road retaining wall in front of Burke High School. |
Cleaning the South Frontage Road in front of Burke High School. |
Preparing to pave the Eastbound lane of the North Frontage road West of 120th Street. |
Preparing to pave the Eastbound lane of the North Frontage Road in front of Remington Heights. |
|
The South Frontage Road was open to One Way Westbound Traffic during the Nebraska State Track Meet. |
The Omaha Police Department control the traffic on the South Frontage Road during the Nebraska State Track Meet. |
||
|